24-Hour Solution Hotline:

+86 13556668682

You are here: Home>>News>>Industry Insights

Automatic Riveting Equipment Case Study: EV Battery Trays

Published: 2026-07-25 17:41:00   Views: 252    Author: Antec
 

 

New energy vehicle plants in China already run highly automated lines, yet many component makers and second-tier suppliers still set rivets by hand. This de-identified case shows how automatic riveting equipment changes the math on battery trays and structural parts.

1. The Riveting Pain Points at Component Plants

Battery trays, battery pack auxiliaries, seat frames, and body stampings carry many fastening points and demand high consistency. Hand riveting leaves missed rivets to chance on the night shift and produces no record for the OEM's system audit; on aluminum parts it also makes distortion and sealing hard to control.

2. The Retrofit: What Automatic Riveting Equipment Changed

ItemBeforeAfter
Missed rivets at critical pointsVisual inspection, occasional misses at nightCounted at each point, incomplete cycle flagged, zero misses
Line manpower4 riveters2 operators tending the machines plus inspection rounds
Data traceabilityNo recordsIO feed to PLC/MES, every point checkable
Aluminum part qualityDistortion and scratch variationFixtures plus scratch-resistant nosepieces, more consistent

3. Sealing and Pull-Force Validation

Battery trays rely on structural adhesive, seals, and a combination of blind rivets and rivet nuts. At the trial stage the joint is validated as a whole, by cross-section and material thickness, with pull tests and seal checks. For volume tray production we recommend a robotic or gantry workstation; for parts such as seat frames, an in-line counting dual-gun machine. For the application area see new energy vehicles; for the industry see new energy vehicle and component riveting.

De-identified case: a new energy auto parts plant

After installing robotic riveting cells and in-line counting dual-gun rivet machines, the plant took missed rivets at critical battery tray and seat frame points to zero, made the data traceable, and cut line labor by about half. It passed the OEM's system audit and took on additional orders.

4. Advice for Suppliers

Start with the station that matters most and is audited hardest. Bring the machine on site, run samples, and collect cycle time, pull force, and missed-rivet data. Then copy the setup station by station, which spreads the investment instead of betting the plant on one large purchase.

FAQ

Q1: Can the machine connect to an OEM's MES?

Yes. In-line and robotic models provide IO signals and count data, and can be tied into the customer's PLC/MES for error proofing and traceability.

Q2: How do you guarantee water tightness on battery parts?

Water tightness comes from sealed rivets, rivet nuts, structural adhesive, and seals used together, plus a sealing validation run on the battery tray process during the trial.

Global Auto Parts Customers: Book an Automotive-Grade Trial

Send the drawing for your battery tray or structural part and your fastener specification, and an engineer will test on site at your plant. Call +86 13556668682.

 

Free On-Site Trial / Sample Testing

+86 13556668682 Book On-Site Trial
Book On-Site Trial / Custom Solution
Engineers bring equipment on-site · Test with your workpieces

Standard on-site trials are free; we will contact you within 1 business day.